An Embraer Phenom 300 at Purdue University Airport in West Lafayette, Indiana, had a short ground stop. The exterior dry wash came off the order because there was not enough time on the ground, and the request was to do what was possible inside. Two technicians worked the cabin and cockpit under a Level 2 interior request and finished in 29 minutes, with time to spare before the aircraft was handed back.

Project Details
- Aircraft
- Embraer Phenom 300
- Airport
- Purdue University Airport (LAF), West Lafayette, Indiana
- Completed
- Time-limited interior detail of the cabin and cockpit, under a Level 2 request
- Crew and time
- Two technicians, 29 minutes
- Client
- Not named
Initial condition
- Lavatory: spots and residue in the stainless toilet bowl and on the drain flapper, and small dark spots on the toilet lid.
- Cabin: close-ups recorded small marks on the light leather and on galley surfaces. Appearance alone could not tell residue from wear, and no repair or restoration was part of this job.
Work completed
- A time-limited interior detail of the cabin and cockpit under a Level 2 request, prioritized to the ground window. It is not presented as a full, unhurried Level 2 detail.
- Before-and-after photos of the interior for the operator's record.
Not performed: the exterior dry wash, which was taken off the order before the visit because the ground time was too short. The exterior was photographed for context only.
Service results
- Toilet bowl: the spots and residue are not visible in the after photo of the same bowl, taken with the seat raised.
- Toilet lid: the dark spots are not visible in the after photo of the same lid.
- Cabin: the seats, tables and aisle were photographed after the time-limited interior detail.
- Time: two technicians completed the work in 29 minutes, with time before hand-back. This is the recorded working time for this job, not a dispatch or turnaround guarantee.
Project photos






Operator takeaway
On this stop the exterior came off the order before the aircraft arrived, so the whole window went to the cabin and cockpit. When the ground time is short, deciding the priority in advance is what lets the work fit the window.